About The Project:

The airplane is a home-built, scratch-built Zenith CH 750 STOL. Building from plans/blueprints is a challenging way to build an airplane, since most of the parts you use to build it are not prefabricated. I chose the Zenith CH 750 STOL for its rugged design, its STOL (Short Take-Off and Landing) characteristics and its aluminum construction. Zenith Aircraft Company has designed this airplane so that it can be built from scratch or from a kit by the average person. They provide excellent technical support for both kit and scratch builders. In addition, I'll be installing a 1965 Chevrolet Corvair 164 cid horizontally opposed, air cooled, 6-cylinder engine, with special conversion parts to make it suitable for airplane duty. This is what the airplane will look like when I'm done, although I'll have a different paint scheme:

Follow my progress below!

Monday, March 20, 2017

Delays, delays and more delays!

Friends,

No exciting content in this update. I just wanted to throw out a quick post about my lack of activity lately. I recently had the flu and one of our household pets was very ill for a few weeks (and ultimately is no longer with us). Shortly after that, my wife had emergency surgery, so I was taking care of her for about a week. In the last month, I only managed a few hours of work on the elevator. In addition, I'm getting our newly acquired travel trailer ready for this year's camping season.

I managed to acquire some new welding accessories and tooling to help with the 4130 frame and fuel tanks. Mainly, I upgraded to a "standard" style foot pedal with some additional tooling. The stock pedal on my AHP AlphaTig 200X left much to be desired. I also added a couple more TIG finger protectors, a clear Furick cup for the torch (this will give more visibility when welding the 4130 in tight places) and a Lagesse Square.


At any rate, I have the elevator skins completely match-drilled to the skeleton, and I'm working on the elevator trim tab attachment (pictures to come soon). 

The last 12 months have been the year of setbacks for sure! I only managed about 250 hours of construction from April 2016 to March 2017....about half of where I should be. All kinds of things just ate up my personal time in the last 12 months, from home improvement/repairs, to injuries, to illnesses, to an unexpectedly very busy holiday season...you name it! I'm hoping things settle down a bit in the coming months, though I may be building a garden shed to free up some room in the garage, and I still having a camper wiring project to complete. At the very least, I hope I don't have to deal with as many illnesses and injuries. 250 hours is a pittance!

Cheers!

Saturday, February 18, 2017

Working on the Elevator

Friends,

The last couple weeks have seen some progress. I was able to get the elevator skins bent properly (working on a video about those), and started drilling the skins. I like to pre-drill the skins so that I have pilot holes that allow me to see the center line of the ribs/spars underneath. This is similar to how Zenith used to ship their kits before they started CNC match-drilling everything. There are ways to drill the skins and ribs blind, but I prefer being able to visually ensure the ribs are in alignment. Plus, with the pilot holes drilled, I generally don't have to worry about the bits wandering.

However, if you use this method, you absolutely must ensure that you've measured your rib stations onto the skins properly. Somehow, I'd managed to locate a rivet line about 3/8" offset from one of the rivet stations. I think I accidentally had the tape measure hooked on something off the edge of the skin, but I don't know for sure. Maybe I just measured wrong. It was a duplicate measurement to the bottom side of the skin, and the exact same mirrored measurements for the co-pilot's side rear skin. It was just the top rivet line of the one side that I'd messed up. I'm going to re-make the skin and use it as a template to pilot hole the new one (without using the bad rivet line, of course). So it'll add an hour or so to the elevator (and scrap the original skin), but I'd rather take care of it now than just fill the holes with rivets.

Elevator Right and Left side Trailing Edge Skins:

Homemade gauge for checking the bend angle:

Elevator Nose Skins roll-formed manually with a 2x4:

Test layout of skins:

Center overlap of rear skins for strength:

Rear skins cleco'd to the spar and ribs:


Another thing to which you have to pay close attention is the rivet pitch and size specified in the plans. The overlapping skins in the center get drilled for A5 rivets at a pitch of 25. I missed that part on the plans, and accidentally drilled them to 40 pitch, which is what the rest of the elevator takes. I compensated by doubling the pitch to 20, with only results in an extra rivet on the front and rear rows, but it also means I have to remake the upper and lower control horns for the elevator to be able to use the existing rivet holes to mount the horns. With the 40 pitch, the rivets fall in slightly the wrong position, causing there not to be enough flange material on the horns. I'll remake the horns with longer flanges to solve that problem.

Thursday, February 9, 2017

3D Printing For Prototypes

Friends,

I've been curious about 3D printing technology for several years. While at AirVenture 2016, I was able to visit the 3D printing display in the drone exhibit. I'd been involved in a few discussions about the viability of 3D printing for aviation. Regarding my STOL CH 750 project, I've identified some key things I'd like to design, and 3D printing is convenient when paired with EAA's Solidworks CAD member benefit. I'm considering using a DIY EFIS/PFD system based on the Raspberry Pi computer and commercially available ruggedized displays. As such, I could end up with a need for custom bezels, mounting brackets, etc. At the very least, I could print custom mounting hardware for GoPro cameras to use while filming flight footage for my subscribers!

I have some other ideas for parts for the airplane, and a distant goal may include manufacturing parts for sale. But let's not put the cart before the horse. Right now, I just want to experiment with the technology as an intellectual exercise. After that, I probably will apply non-structural designs to the airplane. Following that, if the process seems viable, I may turn it into a business venture. Anyway, it's a sort-of project-related idea that I'm excited to share. I even shot a short video about it:


My printer kit:
http://www.gearbest.com/3d-printers-3d-printer-kits/pp_343643.html?wid=21

Prusa i3 Printer, upon which mine is based:
http://www.prusa3d.com/#our-printer

EAA Solidworks Member Benefit:
https://www.google.com/search?q=eaa+solidworks&ie=utf-8&oe=utf-8

Thingiverse 3D Printer File Database and Resource Website:
http://www.thingiverse.com/

Cheers,

Greg

Monday, February 6, 2017

Slat Skin Forming Videos are up!

Friends, I've edited and uploaded the Slat Skin Forming Videos to YouTube. Check 'em out:

Forming the Slat Skins - Part 1/2:

Forming the Slat Skins - Part 2/2:

Stay tuned for an update on forming the elevator skins!

Cheers,

Greg

Sunday, February 5, 2017

Got skins?

Friends,

After finally getting my assembly table rebuilt and getting back to work, I spent the last several days cutting skin blanks for the elevator, slats and flaperons. I decided to go ahead and bend up the slat skins first, as they are the most complicated skins to bend. The nice thing is that they can all be done on the brake, but there is a lot of setup time in between certain bends. And with 4 bend lines on each skin, there is a lot of time laying out the part for bending. 

As always, with the complicated bends and large pieces, I made a test strip about 20mm wide to determine my bend pattern. I got very lucky on the first try (although now I'm so familiar with how the brake bends, that it was a sort of "educated guess" about where to put the bend lines). Here are the results:

Test skin pattern next to slat rib and slat tip. Not the opposing flange bend at the lower right:

Test skin pattern clamped around rib to check measurements:

The first inboard slat skin bent to tolerance (it's perfect!). I bent this skin up from start to finish without bending anything on the other three skins, so to ensure the part would turnout correctly. It is approximately 6 feet long:

 Another view of the first slat skin. These skins are made in .016" and they are extremely flimsy. Care must be taken to avoid kinks and smileys:

All four slat skins bent to tolerance...2 inboard and 2 outboard skins (the outboard skins are nearly 7 feet long). Once the first skin was completed, I switched to "assembly line" mode, and performed the same bend on each skin before setting up the brake to perform the next bend. This saved a lot of setup time compared to how I bent the first skin:

Another view of the slat skins:

I shot a full video on how I bent these skins and it details the bending brake setup issues. The video also includes some of my reasoning on the "how and why" I did things the way I did. I'll get that video cut together soon and post an update with it. I also still have hours of other videos to cut together, particularly the remaining parts of the Horizontal Stabilizer Build. That's all for now!

Cheers,

Greg

Tuesday, January 31, 2017

Assembly Table Video

Friends,

I've posted a video detailing how I built my new assembly table on YouTube...check it out below:


Cheers,

Greg

Monday, January 30, 2017

Finally back at it!

Welcome back fellow aircraft builders and aviation enthusiasts! I've been away for far too long, both from the project itself, and getting my updates published. I was very busy during the holiday season, as I'm sure many of you were. Family visits, random projects, travel...we all have things in life that can take us away from the project. Indeed, the last time I worked on the plane at all was over Thanksgiving weekend! But here we are, the end of January, and I've managed to get back at it.

One of the things that was taking so long was the condition of my assembly table. This whole build process has been an evolution of sorts. My original table design had folding leaves and was not originally going to have to support a 300 lb. bending brake. As the project evolved, including the brake, the original table just wasn't going to cut it. Further, after finishing up the horizontal stabilizer (more video segments to come), I discovered the table had some twist to it that could not be resolved, and transferred some of that to the stabilizer. I was able to minimize the twist in the stabilizer to around 1-degree (more than I would like but still acceptable). Thus, I needed to build a whole new table to avoid putting twist into the other substructures. It was a setback for sure, but a far better decision to start with a clean slate on the table. I cannibalized the old one for some of the lumber, but built a much heavier and more solid table than before. The new table has four 2x6 "longerons" bolstered in the center and at the ends with 2x4s. All of the structural bits are fastened with 1/4" x 2.5" lag screws and washers. Since there are no folding leaves now, there are no longer multiple surfaces to try to level or minimize twist. So, after several weekends of re-organizing the shop, cleaning up, rebuilding things, and finally assembling a new table, I was able to start cutting the skins for the flaperons, slats and the elevator last night. Finally, some actual progress on the plane!

New assembly table (Completed 1/28/2017):

Cutting slat skins out of .016":

Using cantilevered 2x4s to clamp the modular straightedge in place for Olfa cutting:

Another view of the cantilevered 2x4 clamps:

All 4 slat skins rolled for storage until I bend them to shape:
I will finish cutting the skins for the flaperons and elevator before I start bending and assembling any of them. I already have the skeletons done for those structures, so rolling the skins helps keep them out of the way and free from damage until I form them for assembly. I had originally planned on starting the wings this winter, but I have all these assembled skeletons laying around (the slats don't really have an independent skeleton...you start assembly by attaching bits to the skins). By getting these smaller structures done, I'll be able to focus on the wings and fuselage starting in spring/early summer. Lots of visual progress to come!

Cheers,

Greg